MOELCI II Net Metering in Misamis Occidental

MOELCI II (Misamis Ocidental II Electric Cooperative, Inc.) is the franchise holder for net-metering applications in Ozamiz City, Tangub City, and six municipalities: Bonifacio, Clarin, Jimenez, Panaon, Sinacaban, and Tudela. The RE Act (RA 9513) and its 2023-2024 ERC ruleset govern the process — and MOELCI II has its own application forms, inspection cadence, and approval timeline. This page is the step-by-step guide we give every customer in our MOELCI II service territory.

Who this guide is for

You're getting solar installed by SolarConcept Cebu (or any installer) in any of MOELCI II's franchise LGUs:

If you're in Oroquieta or any of the 8 MOELCI I municipalities, the process is similar but the forms and timeline differ — call us for the MOELCI I walkthrough.

What net metering gives you under RA 9513

Under the Renewable Energy Act and ERC's net-metering rules, your solar system exports excess generation to the MOELCI II grid and runs your meter backwards. Your monthly bill becomes a net of what you imported vs. what you exported — typically a small refund or zero bill for a properly sized system. Battery storage is optional; on-grid net metering alone covers most residential installs.

MOELCI II net metering — step by step

  1. Site survey + system design. We visit your home or business, measure roof orientation, shade, and load profile. We submit the system design (panel count, inverter spec, single-line diagram) to MOELCI II's engineering group.
  2. Application filing. We file the net-metering application with MOELCI II on your behalf. Documents include the system design, your franchise area proof (electric bill), proof of ownership or lease, and the customer's ID. MOELCI II reviews within 30-45 working days typically.
  3. MOELCI II approval + meter swap. Once approved, MOELCI II schedules the bi-directional meter installation. The old import-only meter is replaced.
  4. Installation + commissioning. We install the solar system after meter swap confirmation. Commissioning typically takes 1-3 days for residential, 1-2 weeks for commercial.
  5. Net metering activation. MOELCI II inspects the installed system. After sign-off, you start exporting and your meter runs backwards on sunny days.

Timeline + costs to expect

Common MOELCI II application mistakes

What SolarConcept Cebu handles for you

You sign one work order; we handle the MOELCI II paperwork end-to-end: site survey, system design, application filing, follow-up with MOELCI II's engineering group, meter swap coordination, installation, commissioning, and final inspection sign-off. You don't visit the MOELCI II office once.

Get Started — Free Site Survey in MOELCI II Territory

Get Free Site Survey Call +63 915 810 7775

About SolarConcept Cebu: Cebu-headquartered solar installer with a satellite office in Ozamiz City serving all of Misamis Occidental. Same component brands, same warranty, same net-metering handling. About our team →