Slash your electric bill with a system engineered around your actual monthly usage. Free site survey across Cebu, custom design, and battery backup available.
Every system below is in production. Numbers from on-site commissioning, not marketing.
Full hybrid system engineered for a coastal residence with unreliable grid. On-grid when the utility is up, off-grid when it goes down. Surge-protected power room, and a roof array built to survive salt air and typhoon season.
Have a similar site — coastal, hybrid with unreliable grid, or fully off-grid? We engineer around the constraint, not around the spec sheet.
Talk to the engineerTell us your monthly bill. We pick the system that pays back fastest, then engineer the rest around your roof and your load.
Final pricing depends on roof layout, distance from meter panel, and battery configuration. Estimate valid for 2026 installations.
No email. No signup. Numbers refresh as you type. For a real quote, the site survey is free.
Single phase for typical homes. Three phase for larger loads and businesses. Consultation first, installation second.
Fully independent from the utility. Battery bank sized to your nighttime load. Best for sites with weak grid or frequent outages.
Export surplus to the grid. No batteries needed. Net metering paperwork handled. Lowest cost per watt installed.
Grid-tie plus battery. Export when profitable, ride through outages automatically. The most common setup for Cebu homes.
Free site survey and energy audit. We measure your actual load, roof orientation, and shading before recommending anything.
Real reviews from Google. We have shipped 30+ systems since 2022; here is what three of our recent customers posted on our Google Business Profile.
“Very happy with the service and the solar installation. The team was friendly, professional, and easy to deal with. Thank you for the good service and support. Highly recommended!”
“We are very thankful to Solar Concept Cebu for the excellent service and smooth installation of our solar system. From the beginning, the team was approachable, patient, and willing to explain everything clearly. They never made us feel pressured and they took the time to understand what we really needed.”
“Super legit installer.”
From site assessment to a fully operating system — we make the process simple, safe and hassle-free.
We visit, measure the roof, check shading and assess your actual energy needs.
We create a system design tailored to your load, with a single-line diagram, panel layout and BoQ (bill of materials).
We handle the necessary applications and approvals with your electric cooperative and local authorities.
Our professional team installs the system, ensures safety devices are in place and protects your investment with proper grounding and lightning protection.
At Solar Concept, we believe a solar system should never be based on a generic package or a simple quotation.
A degree is not a quote. A quote is the result of understanding your property.
Every project begins with an engineering assessment—evaluating your roof, energy consumption, available space, electrical requirements, solar potential, and future needs. From there, we design a system that is properly sized, technically sound, and built to deliver long-term value.
Because the right solar system is not simply the one with the most panels or the biggest battery. It is the system designed specifically for your home or business.
“The sun gives light to our homes. Christ gives strength to our hearts. I simply wire them together.”
For us, engineering is more than calculations and equipment specifications. It is about creating reliable energy solutions that serve people, protect investments, and make a meaningful difference for years to come.
No commitment. We visit, measure, and quote. Most site surveys take 45 minutes.
For anything urgent, call or message us directly: