Sizing a solar system is one of those things that looks technical but is mostly arithmetic. If you have a VECO bill, a tape measure, and 20 minutes, you can get within 10% of the right size for your roof. The last 10% requires a real site survey (shade, orientation, obstructions), but the first pass is yours to run.
Here is the actual method we use when we sit down with a Cebu homeowner for the first time.
Step 1: Get your annual kWh usage
The single most important number is how many kWh you use per year, not per month. The annual figure is what the system has to produce to offset your bill. Solar production dips in the rainy season (June–November in Cebu), so a system sized only for your best month will underperform in January.
Pull your last 12 VECO bills. Add up the kWh. That is your annual load.
Typical Cebu households:
- Small condo unit (1–2 people, electric fan, small ref, occasional aircon): 1,800–3,000 kWh/year.
- Standard family home (4–5 people, 1–2 aircons, ref, washing machine, internet): 4,500–7,500 kWh/year.
- Larger home with multiple aircons or a home office: 8,000–14,000 kWh/year.
- Big house with full central aircon or a pool pump: 15,000+ kWh/year.
If you do not have 12 months of bills, multiply your most recent month by 12 and add 10% for the aircon-heavy dry season (March–May).
Step 2: Decide your offset target
You do not need 100% offset. VECO has a minimum monthly charge, and at night you will always draw some grid power. Realistic targets:
- 70–80% offset: Best payback-to-investment ratio. Covers most of the bill. Leaves you paying VECO the minimum charge plus a small night draw. Most Cebu homes we work with end up here.
- 90–100% offset: Requires a bigger array (or batteries) to push the bill close to zero. Payback is longer because of the extra hardware, but the bill practically disappears.
- 100%+ offset with net metering: You export more than you use over the year. Credits roll forward month to month. After 5 years, unused credits are supposed to be paid out — though in practice, payout timelines across Philippine electric cooperatives have been slow.
Step 3: Convert kWh to kW of panels
Cebu gets about 5–6 peak sun hours per day, and panels lose some efficiency to heat, dust, and wiring losses. The practical capacity factor in Cebu is around 1.4 kWh per installed watt per year. That is, 1 kW of panels produces about 1,400 kWh per year here.
So the formula is:
kW needed = (annual kWh × offset %) / 1,400
Worked example: a home using 6,000 kWh/year, targeting 80% offset.
- 6,000 × 0.80 = 4,800 kWh to be produced by solar.
- 4,800 / 1,400 = 3.43 kW.
- Rounded up to the next standard size: 4 kW.
- At 550W per panel: 8 panels.
- At 615W per panel: 7 panels.
A 4 kW system on this home would actually produce ~5,600 kWh/year (more than the 4,800 target), giving the homeowner a slight overshoot and net-metering credits to roll forward. That is normal — we round up to the next panel size.
Step 4: Check the roof
Each modern 550W panel is about 1.7 m × 1.1 m, or roughly 1.9 m² with mounting spacing. A 10-panel array needs about 19 m² of usable roof, plus walkways around the panels for service access. Most Cebu concrete-roof homes have this much space available after subtracting the water tank, stairs, and parapet shadows.
Two roof checks to do physically:
- Measure the usable rectangle. Walk the roof, identify the obstruction-free rectangle, measure it. Compare to your panel count × 1.9 m².
- Identify the orientation. In Cebu (latitude ~10° N), south-facing is best, west-facing is close, east-facing loses afternoon production. A flat roof lets you tilt the array to whatever orientation you want — most installers default to south or southwest.
Step 5: Check shading
The single biggest sizing mistake homeowners make is ignoring shade. A 10-panel array with 2 panels shaded from 2–4 PM can produce 30–40% less than the same array on a clean roof.
Sources of shade in Cebu neighborhoods:
- Neighboring two-story house (shade on lower roof in the morning or afternoon).
- Mango, acacia, or narra trees within 5–10 meters of the roof edge.
- Covered garage, lanai, or roof deck that casts a moving shadow.
- Future construction — an empty lot next door is not empty forever.
If your roof has partial shade, the fix is not more panels — it is microinverters or DC optimizers at the panel level, so one shaded panel does not pull down the whole string. We use this approach routinely on Cebu homes with mature trees in the yard.
Step 6: Match the inverter
The inverter has to be sized to the array, not the other way around. The standard rule:
- Panels (DC) ÷ inverter (AC) = 1.0 to 1.3 — this is the DC/AC ratio.
- A 6 kW inverter can handle 6–7.8 kW of panels.
- Going above 1.3 starts clipping production on the brightest hours; going below 1.0 wastes inverter capacity.
Common Cebu inverter sizes for residential:
- 3 kW — starter systems, small bills.
- 5 kW — most common, matches a 6–7 kW panel array.
- 6 kW — for arrays up to 7.8 kW.
- 8–10 kW — larger homes or those adding batteries now/later.
Step 7: Decide on batteries (if any)
Batteries are a separate decision from panel count. Most hybrid Cebu installs use the same 5–6 kW array as a comparable on-grid install — the battery just shifts when the production gets used.
Battery sizing rule for hybrid systems:
- List the loads you want backed up (lights, outlets, fridge, internet, select aircon).
- Add up their wattage.
- Decide how many hours of backup you want during a brownout (typically 4–8 hours in Cebu).
- Multiply: watts × hours / 1,000 = usable kWh of battery.
- Add 20% buffer: most lithium batteries should not discharge below 80% depth for long life.
Example: backing up lights (200W), fridge (150W), internet (50W), one aircon (1,200W) for 6 hours:
- Loads: 1,600W.
- kWh: 1.6 × 6 = 9.6 kWh.
- With 20% buffer: ~12 kWh battery bank.
A 10–15 kWh lithium battery bank covers most Cebu household brownouts. If you want full aircon backup through long outages, you jump to 20–30 kWh and the cost rises quickly.
Putting it all together: a real Cebu example
Family of four in Consolacion, PHP 5,500/month bill, 6,000 kWh/year. Concrete roof, 50 m² usable, south-facing, no significant shade.
- Target offset: 80% → 4,800 kWh to produce.
- System size: 4,800 / 1,400 = 3.4 kW → round to 5 kW.
- Panels: 5 kW / 0.55 kW per panel = ~9 panels of 550W. Round to 10.
- Inverter: 5 kW Solis grid-tie.
- Roof usage: 10 × 1.9 m² = 19 m². Fits comfortably.
- All-in price: PHP 235,000–265,000 for on-grid, PHP 380,000–450,000 if adding a 10 kWh hybrid battery.
- Expected annual production: ~7,000 kWh — enough to net out at near-zero imports over the year.
- Payback: 4.5–5 years on the on-grid version.
The math is straightforward. The part that is harder to model without standing on the roof is shade, obstructions, and future changes (new neighbor builds a wall, a tree grows, the family adds an aircon). That is what the site survey is for.